If this is what you are asking
then, Yes.
I figured out that DIRID_PK (DIR) could be Daily Inspection Report.
Haven't figured out what QEIID_FK (QEI) stands for.
You really haven't told us much about the design..... which, after looking at the form, brings up a lot of questions about the dB design for me.
So for one record (one Daily Inspection report):
How many Inspectors can there be?
Is the start time and end time the same for all Inspectors?
How many Subcontractors are/can be involved?
Can there be/are there more than one Specification? the label says "Specification(s)".
There are 4 Location controls. One inspection (DIR) covers up to 4 locations?
How many DeficiencyTypes can there be? For each Location? Or for this record (DIR)?
I don't know your process or requirements, but did you design the dB structure on paper or do an analysis first? It is hard to go from a paper form, to moving it to a computer/database and capturing the required data. Maybe something to think about...
time....