I have a Material Tracking Database. We have 45 large components that require a week or so to load each one. I was looking for a simple way to populate a given record with a start date and have the following components (records) be populated with start dates aligning with the 7 day loading time. I was also hoping to be able to generate a report that would show all projected dates. I anticipate the crews will improve production time so I would like to be able to change the loading time duration and project those dates as well. I think I've made this harder than it should be.