I have a report that I am using two different date fields for. One is from a Data field that is from another database table linked into the current. Another is from the exisitng Database I am working in. I have to put Date parameters on both Date Fields. How do I pass the parameters in the report for both date fields. The fields names are different and are from two different tables. Is there a way when the user runs the report they do not have to put the Date parameters in twice.